This comprehensive project involved the replacement of the HVAC system and various security and facility upgrades, demonstrating our multifaceted expertise. Key aspects of our involvement included:
- Pre-Design and Design Support: Offered critical pre-design support and prepared the necessary design documents, laying a solid foundation for the project.
- Self-Performed General Contracting: As a self-performing general contractor, our responsibilities extended to several key areas:
- Executed construction painting, enhancing the school’s aesthetic appeal.
- Installed security camera systems, significantly improving the school’s safety and security.
- Upgraded to a complete HVAC digital direct controls panel system, ensuring modernized and efficient climate control.
- Replaced the cooling tower and updated AHU valve controls for optimal HVAC performance.
- Conducted window repairs and ceiling tile replacements, maintaining the integrity of the school’s infrastructure.
- Installed hi-lo drinking fountains, fume hood interlock, and a new greenhouse, contributing to the facility’s functionality and educational environment.
- Repaired exterior doors, further bolstering security and functionality.
This project at Coral Reef Senior High School not only upgraded essential systems but also improved the overall safety, functionality, and aesthetic of the school.