Wetland Restore CX-40 – SABER

Description:

The overall project involved providing and constructing a pre-engineered structural steel Pavilion & concrete foundation, Pedestrian Crossover Bridge & concrete abutments, electrical, and potable water. Additional civil work included storm water drainage & grading to include land clearing, pavement restoration, swales, berms, provision of clean fill, and provide culver miter end grates. The project is located south/east of the NOTU Engineering Support Building (ESF) facility 74074.

  • U.S. Air Force
  • Patrick AFB, FL
  • July 2013

Download the PDF Checklist

The link will be available instantly.