Description:
Lunacon’s USACE contract work for the HVAC Reset in Vicksburg, MS was completed while the facility was fully occupied by the client, and operational. New mechanical systems were brought in to replace the existing system and DDC controls. Miscellaneous architectural work was required for the installation of the new mechanical equipment. Fan coils and air handlers were located in the ceiling spaces, and were replaced with a new VAV air distribution system, so that the building could better serve the client need. The project required that the system be tested and balanced, and was completed on schedule.