Stabilize Beehive Blockhouse – SABER 1

Description:

The Cape Canaveral Blockhose was experiencing extreme exterior deterioration from weather and overgrown vegetation. The Air Force awarded a contract to Lunacon to remove all vegetation and prevent further deterioration. We effectively removed vegetation, and stabalized the existing exterior with a strong, weather resistent seal coating to precent future damage to the building.

  • U.S. Air Force
  • Cape Canaveral, FL
  • February 2011

Download the PDF Checklist

The link will be available instantly.