Runway Approach Lights (Mobile SATOC)

Pahe 1

Work covered consisted of, the furnishing of all plant, labor, services, tools, materials, equipment, transportation, supervision and all miscellaneous requirements to perform all operations in conjunction with the effort to accomplish: – Underground electrical – Displaced Treshold – Pavement Markings – Approach Lighting at SALS Repair – Runway Hold Signs and Bird Control – Site work – Lightning Protection System and Solar Lighting.

Pahe 2

The work covered consisted of miscellaneous requirements to perform all operations in conjunction with the effort to accomplish: Underground electrical, displaced treshhold, pavement markings, approach lights at SALS repair, runway hold signs and bird control, lightning protection system and solar lighting. All work was done in conformance with applicable drawings and OSHA, the latest National Electrical Code, NFPA 78, Underwriters Laboratories Standard UL96, UL96A, MIL-HDBK 419 and Lightning Protection Institute Standard 175 requirements. All disturbed areas shall be restored to their original conditions. A continuous ground wire shall be used throughout the circuits.