Repair HVAC @ NOTU Hangar Y 2nd Flr (SABER 3)

Description:

This Project includes removing and replacing existing 10 ton HV AC unit and providing a new 10 ton unit system and replace with new. Installing new DX split system air cooled 10 ton unit. We replaced all chilled water piping as necessary to complete scope.

Download the PDF Checklist

The link will be available instantly.