Repair Hangar C High Bay, Facility 1348 (SABER 1)

Repair Hangar C High Bay, Facility 1348 (SABER 1) 2017-10-28T16:23:00+00:00

Project Description


Repaired the High Bay of Hangar C for preparation of a Rocket Display Storage. The scope included filling in trenches in the hangar bay with sand and concrete level with existing floor. Paint the hangar bay floor and all walls within the hangar bay. Remove scaling lead paint from interior high bay beams, tracks and inside surfaces of hangar doors and repaint. Remove asbestos from piping systems in the high bay only. Remove all modular towers to include all walls, electrical, and HVAC.


U.S. Air Force


Cape Canaveral, FL


March 2011


Project Details